Routing the cable through the deck mast

Follow the steps below to route the transducer’s cable through a deck mast.
Cable routing

Description

1

Wind vane transducer

2

Mast

3

Compatible instrument display

4

Deck

5

Junction box

6

Bulkhead

  1. Feed the cable down the mast and out through a suitable below-decks aperture.
  2. Run the cable back to the display or converter and connect the spade terminals to the relevant connectors.