Commissioning process
Before using your autopilot system for navigation for the
first time, ensure that you have completed the necessary Commissioning
process:
- Check that you have adhered to commissioning pre-requisites
- Perform the Initial power on and set-up
- Complete the Dockside Calibration (Dealer Settings on SeaTalk systems)
- Set the hard-over time (non-rudder reference systems only)
- Complete the Sea trial calibration
- Perform System checks
For the complete Commissioning instructions, refer to: www.bit.ly/p70-pilot-comm