Commissioning steps

The required commissioning steps should be carried out in the correct order using the pilot controller display.
Commissioning steps
Note

Commissioning must be performed using the datamaster MFD.

  1. Power-up all of the components that make up your autopilot system.
  2. Vessel Hull TypeSelect the relevant vessel hull type for your vessel.
  3. Dockside wizardComplete the dockside calibration process, using the Dockside wizard:
  4. Hard-over timeIf the system does NOT include a rudder reference transducer then, specify the hard-over time.
  5. Compass linearizationComplete compass linearization.
  6. Compass lockIf required, lock the compass.