Commissioning steps
The required commissioning steps should be carried
out in the correct order using the pilot controller display.
Note
Commissioning must be performed using the datamaster MFD.
- Power-up all of the components that make up your autopilot system.
- Vessel Hull TypeSelect the relevant vessel hull type for your vessel.
- Dockside wizardComplete the dockside calibration process, using the Dockside wizard:
- Hard-over timeIf the system does NOT include a rudder reference transducer then, specify the hard-over time.
- Compass linearizationComplete compass linearization.
- Compass lockIf required, lock the compass.